This site requires client side scripting.
Newlogo.jpg GESAblue.jpg
The cost of foundation repair may be considerable and perhaps not all projects can be cost justified. But High power, Mission Critical machines with high outage rates and repair costs can payback the costs of a polymer repair in a few months and create substantial cash flow afterwards.

We have experience with many configurations - for example: compressors, pumps or other machines being driven by an electric motor; a diesel engine driving a generator or other device; or a steam (or other) turbine driving a generator or other type of machine. In the following table , we estimate the savings potential for a simple situation - a machine driven by an electric motor. Of course, we would be glad to estimate cost savings for other configurations.

Look at the example data entered below and the little time - less than four months - it took this client to payback its investment of 250.000 €uros. With ongoing annual cost savings of 874.815 €. Then, enter your values in the form below to see your potential cost savings. Finally, if you would like Alphatec Engineering to estimate a payback for your project, enter your email and send the form with your data to us - we'll respond quickly to your email address.
VariableExample valueYour value
(no commas)
Potential cost savings (€)
Year of installation1985 Example SavingsYour Savings
Machine failures to date10874.815
Cost of repairs to date (€)100.000 Intermediate variables
Hourly value of machine output (€)1.0001. Annual repair costs Savings
Machine outages (number) - last 12 months52. Reduction of Downtime
Machine downtime (hours) - last 12 months1203. Increased Performance
Current operating level ( % of rating)754. Lower energy costs
Average hours of machine usage per year4.200
Average motor voltage460
Motor power factor0,92
Average machine amperage before alignment40
Cost per Kilowatt hour (€)0,08